How to Guide

Villa Barcelona
Wall Installation
Instructions
Villa Barcelona
WALL INSTALLATION INSTRUCTIONS
READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. If the following instructions
leave any unanswered questions or if additional information is required, please call Villa Barcelona toll free at
844-
658-4700.
MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION
Responsibility for the suitability of Villa Barcelona products for each individual installation cannot be assumed by
Villa
Barcelona since Villa Barcelona has no control over the installer’s proper application.
Should an
individual plank be doubtful as to appearance or dimension the installer should not use this piece.
PRE-INSTALLATION JOBSITE REQUIREMENTS
Villa Barcelona cannot be held responsible for site conditions.
Carefully examine the material prior to installation for grade, color, finish, and quality. Ensure adequate lighting for proper
inspection. If material is not acceptable, contact your supplier immediately and arrange for replacement. Villa
Barcelona cannot accept responsibility for material installed with visible defects. Prior to installation of any material, the
installer must ensure that the job site and walls meet the requirements of these instructions. Villa Barcelona is not
responsible for material failure resulting from unsatisfactory jobsite and/or subfloor conditions.
Wall paneling/planks should be one of the last items installed in any new construction or remodel project. All work
involving water or moisture should be completed before material installation.
Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at
least one week before installation of material. Optimum room temperature of 7F and a humidity range of 30% - 50% is
recommended during installation. Humidity levels below 30% will most likely cause movement in the material, including
gapping between pieces and possible cupping and checking in the face.
Store the material in the installation area before installation to allow material to adjust to room temperature. Do not store
the boxes of material directly on concrete. When installing in a properly acclimated environment,(65-75 degrees and
30%-50% relative humidity) material does not need additional acclimation. Shuffle the boards from several cartons for
best visual mix of lengths and color.
400 Oyster Point Blvd. Ste. 211
San Francisco, CA 94080
Phone: 844-658-4700
ATTENTION! READ BEFORE INSTALLING!
COLOR VARIATION
This is a natural product and color variations are to be expected. For best visual effect, shuffle
planks from several cartons and do not install boards varying greatly in color next to one another.
WALL PREPARATION
Wall should be smooth, in good condition, and relatively straight and plumb with minimal
bowing or curving of wall. Masonry walls and exterior walls should be moisture proofed prior to
applying planks to walls.

Summary of content (3 pages)