Installation

Grain + Rod
Wall Mounted Wood and Metal Wine Rack Panel Installation Instructions
The following instructions can be used for all congurations of the Grain + Rod modular wine wall
system.
Video guides, spec sheets, and additional support are available at grainandrod.com.
(1) Wood board
(3, 6, or 9) Vino Pins
or Vino Rail
Extension studs
(optional)
(6 or 18) 35mm
screws
Parts List & Congurations
(3) Keyhole hangers
(6) Keyhole screws
(3) Sprial Drywal Anchors
(3) Wood lags
(1) Plotting Guide
Step 1: Attach the Keyholes
Using 2 short wood screws for each hanger, afx 3 metal
keyholes to the corresponding pre-drilled holes on the
back of the wood board. Position the hanger with the
smaller side of the opening toward the top of the board.
Step 2: Install the Racks
Insert the 35mm screw sthrough the back of the board so
the screw head ts into the inset hole. For Vino Pins* lay-
outs, ensure the base Pin (wider impression) is installed
on the lower of the two holes, and the neck Pin (narrower
impression) is installed in the higher of the two holes.
Thread the Pin or Rail to the front of the board onto the
exposed screw that is sticking through. With a screw-
driver or drill, tighten the Pin or Rail.
Repeat for remaining Pins or Rails.
* If installing a two-deep or three-deep Vino Pins cong-
uration, connect the extension Pins before attaching to
the board. Thread a stud into one end of the extension
Pin and screw the starter base Pin onto the remaining
exposed end and rmly hand tighten. Connect any ad-
ditional extensions in a similar fashion for both the neck
and base side of the Pins.

Summary of content (2 pages)