Instructions / Assembly
Installation
9
Procedure:
1
• Screw chamber clamp(s) to
the wall (#10 screws
recommended.)
2
2
• Insert chamber and tighten
clamp(s).
•
Make all necessary plumbing
connections. Refer to
Section 2.1.
3
• Mount controller mounting
bracket to wall using four #8
screws (not provided).
4
• Slide controller onto mounting
bracket.
5
Note: Outlet must be
protected by a Ground Fault
Circuit Interrupter (GFCI).
6
• Connect power cord to
controller.
• DO NOT connect the power
cord to the GFCI outlet at this
time.
7
• Place O-ring on the sleeve as
shown. Insert the sleeve into
the chamber as shown in
step 8.
8
• Ensure quartz sleeve is
properly centered in the
chamber.
9
2
1
• Place sleeve bolt onto the
quartz sleeve, carefully push
down and hand tighten onto
chamber.
1010
2
1
• Insert lamp into the quartz
sleeve and thread into sleeve
bolt until hard stop.
11
• Connect the green ground
wire and red strain relief wire
to the chamber using the
grounding screw.
1212
• Align connection pins with the
lamp connector by rotating
the ring clamp.
• Push the lamp connector
down onto the lamp pins and
the ring clamp pins until an
audible click is heard.
Note: Ensure the connector
is engaged on both sides.