Installation Guide

15
Please contact vissani@conglom.com or 1-888-449-9197EHWZHHQDPSP(670RQGD\)ULGD\IRUIXUWKHUDVVLVWDQFH
ENGLISH
Installation (continued)
Secure the range hood in place using the supplied
fasteners.
Frameless cabinet installation requires four long tapping
screws (AA) with washers. Use the two slots on each
side to secure the range hood directly to the cabinet
VKRZQLQŵJXUH
Framed cabinet installation requires four short tapping
screws (BB) with washers. Use the two slots on each
side to secure the range hood directly to the metal
EUDFNHWVKRZQLQŵJXUH
FINAL INSPECTION
Inspect all of the electrical and duct connections. Make
sure the damper assembly (or round duct adapter)
enters the ductwork and that the damper opens and
closes freely.
:KHQVDWLVŵHGZLWKWKHLQVWDOODWLRQUHLQVWDO
l the grease
shield DQGWKHŵOWHUV
Restore the power to the range hood and ensure that the
lights and fan are operating correctly.
BB
BB
FRAMELESS CABINET
AA
AA
FRAMED CABINET
Fig. 22-1
Fig. 22-2
Fig. 23
Grease Shield