!!!OVERSIMPLE‘ RAILING SYSTEMS COMPONENTS ACCESSORIES TUSCANY RAILING INSTALLATION GUIDE gl s stencil il by Baggies installment aphids posts Frat alt Readerships Tt o \ Angle Auditors make sink 1 ages sample e et This document is a detailed step—by—step installation guide for the Tuscany rail system. These instructions may not cover all scenarios that may arise. Before beginning your installation take time to read all instructions thoroughly.
Step 1 Install Newel Posts ™ A) Set posts to accommodate required rail lengths. See detail 1-5, 1-6 for post attachment methods. Considering your rail height, posts may be trimmed to a desirable post height. =] 1 Diagram 1-A A) Measure the distance between posts. B) Mark the required length on the rails keeping preinstalled holes centered between the marks. C) Subtract 1/8° (3mm) ot each end for hanger brackets.
STAIR INSTALLATION ® A) Lay the bottom rail across the nosing of the stairs keeping the preinstalled holes centered between the posts. Mark the points were It Interacts the posts. Sea Detail 6-A B) Subtract 1/8" (3mm) ot each end of rails for hanger brackets. C) Trim the bottom tall with a miter saw. D) Repeat this process for the top rail ensuring that the preinstalled holes are facing downward. E} For bottom rails, place brackets over ends of rail with preinstalled holes and open end of bracket facing up.
Step 6 Installing The Cap Rail A) Measure the distance between the posts. B} Mark the required length on the cap rail and trim with o miter saw. C) Apply exterior type Il glue to the top rail. Cap rail is fitted on top and nailed, 2 %" (63mm) galvanized nails @ 12" (600mm). See detail 1-3 Fasten the cap rail to the post using 2—4#8 x 2" {50mm) screws installed ot o 45 degree angle. See detail 1-1 and 1-3.
Page 4 Detail 1-5 Exterior Connection: Posts For Guards That Run Perpendicular to Deck Joists Minimum {12.7mm} Rim Holst diameter thru—bolts ond washers at the hold down anchor’s — attachment to Holst Trigonometric Hold down anchor Align guard post, at Holst locations % (12.7mm) Thru—Bolts And Washers Per Connection . L] = Rim joist Detail 1-5 Exterior Connection: Post Bolted to Rim Joist 1/2" (12.7mm) Thru—Bolts 1) Decking s omitted from plan view and the econometric view for clarity.
!!!OVERSIMPLE RAILING SYSTEMS-COMPONENTS -ACCESSORIES For Technical support please call Instructions are also available on our website www.railsimple.com Tool List Hammer Ratchet Wrench Tape Measure Wood Chisel Miter saw Level Clomps Hand Drill Stainless Screws #8 x 2" (50mm) Drill Bit Size &" (3.