Move the arbor to its final location (you will need a helper). When
you are satisfied with the location, mark th
e locations of the posts,
then move the arbor aside and lay it carefully on its side. Excavate
4 holes approx. 10(25.5 cm) deep. Carefully move the arbor back
into position and level it both vertically and horizontally.
Backfill the holes with the excavated soil to cover the anchors.
1
2
A Into Earth (temporary Installation)
1
B
2
18" (45.75 cm)
6"
(15.25 cm)
Similar to the above steps, move the arbor to its final location. When
you are satisfied with the location, mark the locations of the posts,
then move the arbor aside and lay it c
arefully on its side. Excavate 4
holes approx. 18(45.75 cm) deep, 6“ (15.25 cm) diameter.
Fill the holes with wet cement flush to the ground. You will need 2
bags of pre-mix concrete (purchase separately). Carefully move the
arbor back into position.
Support the arbor and level over the holes with bricks, stones or
blocks of wood under the bottom rail of the side panel. The post bottoms
should insert themselves approximately 1(2.5 cm) into the concrete.
Allow the concrete to set.
1
2
3
B Into Earth With Concrete Footing
Arbor Installation
A
1
10" (25.5 cm)
6"
(15.25 cm)
2
Level
Level