Use and Care Manual

In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM
to 4:00 PM EST).
1.
Arched T op Rail
(1) - 10643-1
2.
P
ost Caps (2) -10611
3.
P
osts Left (1) -10629
4.
P
osts Right (1) -10630
5.
Vertical Spindle Left
(1) -10631
6.
Vertical Spindle Right
(1) -10632
7.
Horizontal Spindles
(4) -10633
8.
Diamonds
(2) -10646-1
9.
Bottom Rail
(1) -10635
10. Ground Mounting Extensions (2) -10636-1
11. 5/8” (16 mm) Self-Auguring Stainless Steel Screw (12) -20016
Tools You Will Need
Cordless Drill
Hammer
Tape Measure
Level
Shovel
General Information
Read Instructions through carefully before beginning assembly.
When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 5’x 8’ (1.5m x 2.4 m) for unobstructed assembling.
You should not need to use excessive force when assembling components.
The Milan Trellis
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
1
2
11
Not to Scale
9
59.25 in
(151 cm)
4 in (10 cm)
27.25in
(69 cm)
55.25 in
(140 cm)
20 in
(51 cm)
3
5
6
7
8
10
IMPORTANT: CHECK THE INSIDE OF YOUR POST
S FOR ALL MATERIALS.
Check Box for These Contents
V2.3/061020
4

Summary of content (3 pages)