Instructions / Assembly

7
Input Voltage AC120V - DC24V (VRO-5WP only)
Daily Water Production 50 GPD/189L
Tank Size 3.2 U.S. Gal/12.0L
Temperature of Water 5 - 45˚ Celsius
Max. TDS 1000 ppm
RO Membrane Rejection 92 - 99%
Treatment Stages 3, 4 and 5 stage
Step 1 Turn off the cold water supply by turning off the shut off valve under the sink. If the cold
water line does not have a shut off valve under the sink, turn off the main water line in the
house.
Step 2 Turn on the cold water faucet and allow all the water to drain from the line. On a single
handle faucet, the hot water may have to be turned off to prevent any hot water cross
over.
Step 3 Loosen nut and separate cold water braided flex line from the Kitchen Cold Water Faucet
Shank. Attach the slip joint adapter to the kitchen cold water faucet shank using the
rubber washer supplied in the kit. Reinstall the flex line onto the slip joint adapter and
tighten. Use Teflon tape on all threaded connection points.
Step 4 Attach the ball valve to the slip joint adapter. Use Teflon tape on all threaded connection
points.
Step 5 White ¼” tubing is attached to needle valve and tighten with compression nut.
CAUTION: The water supply to your unit MUST be from the COLD WATER LINE.
Hot water will severely damage your RO System.
speCifiCations:
tapping into Cold wateR line:
Kitchen cold water faucet shank
Rubber Washer
Needle Valve – Use Teflon tape on all threads
¼” Compression nut
Slip Joint Adapter- Use Teflon tape on thread
connecting to kitchen faucet cold water shank
Flex line to inlet water supply - use Teflon Tape
on all connection points