The VRO-3Q and VRO-4Q have been tested and certified by NSF International against NSF/ANSI Standard 42, 58 and CSA B483.1 for reduction of the claims specified on the performance data sheet UNDER SINK Reverse Osmosis Filtration Systems The VRO-5Q has been tested and certified by NSF International against NSF/ANSI Standard 58 and CSA B483.
Table of Contents: Safety Precautions ............................................................ 1 * Mounting the Ball Valve Onto Storage Tank.............. 11 Conditions for Operation.................................................. 1 * Connecting the Water Lines........................................ 11 Package Contents............................................................. 2 * Tubing Connection with Push-in Fitting....................... 12 Tools Required for Installation ................
Package Contents: VRO-3Q B. F. E. VRO-4Q A1 A2 H. I. J. K. L. G. C. M. D.
Reverse Osmosis System Layout and Components: VRO-3Q Filtration Process: Auto Shut-Off Valve Black 1st Stage 2nd Stage 3rd Stage Black Replacement Parts Filter Stage Part Number Description Service Life Filter Color Code 1st 2nd 3rd VRFQ-CTO VRFQ-RO VRFQ-CTO 6 to 12 Months 24 to 36 Months 6 to 12 Months Green Dot Blue Dot Green Dot Carbon Block Filter, 5 Micron TFC Membrane 50 GPD Carbon Block Filter, 5 Micron 3
Reverse Osmosis System Layout and Components (continued): VRO-4Q Filtration Process: 1st Stage 2nd Stage 3rd Stage 4th Stage Black Replacement Parts Filter Stage Part Number Description Service Life Filter Color Code 1st 2nd 3rd 4th VRFQ-PP VRFQ-CTO VRFQ-RO VRFQ-CTO 6 to 12 Months 6 to 12 Months 24 to 36 Months 6 to 12 Months Yellow Dot Green Dot Blue Dot Green Dot PP Sediment Filter, 5 Micron Carbon Block Filter, 5 Micron TFC Membrane, 50 GPD Carbon Block Filter, 5 Micron 4
Reverse Osmosis System Layout and Components: VRO-5Q Filtration Process: Black Replacement Parts Filter Stage Part Number Description Service Life Filter Color Code 1st 2nd 3rd 4th 5th VRFQ-PP VRFQ-CTO VRFQ-CTO VRFQ-RO VRF-T33 6 to 12 Months 6 to 12 Months 6 to 12 Months 24 to 36 Months 6 to 12 Months Yellow Dot Green Dot Green Dot Blue Dot N/A PP Sediment Filter, 5 Micron Carbon Block Filter, 5 Micron Carbon Block Filter, 5 Micron TFC Membrane 50 GPD T33 Inline Carbon Filter 5
Installation Instructions: All Vitapur RO Systems have been pre-assembled and tested at the factory, and don’t need to dis-assemble. If you want to check or replace the filter(s). The following steps need to be implemented: Installing the Quick Connect Filter (See Figure 1): 1. Unlock the Locking Tab by sliding it from the right to the left of the slot to ‘Unlock’ Position. 2. Lift the filter top section into the Head. Turn the filter about 1/4 turn in the direction as shown in figure 1 until it stops.
Installation Instructions (continued): Tapping into Cold Water Line (See Figure 3 and 4): CAUTION: The water supply to your unit MUST be from the COLD WATER LINE. Hot water will severely damage your filtration system. 1. Turn off the cold water supply by turning off the shut off valve under the sink. If the cold water line does not have a shut off valve under the sink, turn off the main water line in the house. Place a tray or towel under the cold water line to catch the excess water. 2.
Installation Instructions (continued): CAUTION: CAUTION: CAUTION: CAUTION: Do not drill through a counter top that is more than 1” thick. Do not attempt to drill through a tiled, marble, granite or similar countertop. Consult a plumber or the countertop manufacturer for advice or assistance When drilling through a countertop make sure the area below the drilled area is free of wiring and piping.
Installation Instructions (continued): Installing the Air Gap Faucet Continued (see figure 7 and 8): 3. Loosen stem-nut on the faucet. 4. Slide Chrome Plate and Black Rubber Washer onto the faucet stem. The chrome plate, rubber washer and faucet body are installed above sink or countertop. 5. Feed the 3/8” and ¼” black tubing through the pre-drilled hole in the sink/counter. 6. Place the faucet through the drilled faucet hole, then add Spacer, Securing Plate, Star Lock Washer and Stem Nut. 7.
mp e Installation Instructions (continued): 5. Make sure the black rubber gasket is adhered to the inside wall of the clamp and place the clamp assembly over the drain pipe. Insert 3/8” black tube into the drilled hole. Tighten the clamp. CAUTION: Do not overtighten the screws, it may crack the clamp. CAUTION: The black 3/8” drain tube must be as SHORT and STRAIGHT as possible to the drain saddle, making a downward slope from the faucet to the drain saddle to allow for proper drainage.
Installation Instructions (continued): Mounting the Ball Valve Onto the Storage Tank (See figure 11 and 12): 1. Connect the Ball Valve to the water Storage Tank thread on the upper side of the tank. Make sure the black rubber gasket sits flat. Tighten the valve but do not overtighten. 2. Connect the 1/4” yellow tubing to the ball valve. Push the tubing in all the way to make sure it is properly seated. 3. Turn the ball valve off. Figure 11. Figure 12.
Installation Instructions (continued): Tubing Connection with Push-in Fittings (See Figure 14, 15 and 16): 1. Take off the blue horseshoe clip from collet. 2. Pull out and discard the protect plug by pushing the collet inward and holding with fingers. 3. Insert Tubing into the collet. Full engagement is 11/16” length of the tubing into the fitting for 1/4” tubing, and 3/4” length for 3/8” tubing. NOTE: Ensure tubing is pushed all the way to backstop. 4. Put blue horseshoe clip back on collet. Figure 14.
Start-up Instructions (continued): 4. Water pressure will start to build in the RO system in about 2 hours. Carefully inspect all fittings and connections. Check for leaks and fix if any are found. 5. Open RO faucet and let water flow through the system for a 24 hour period. Water will flow heavily until the Storage Tank becomes empty, and then it will be a slow drip for the balance of 24 hours. 6. Close RO faucet after 24 hour purge is complete. 7. RO system is ready for use.
Periodic System Maintenance (continued): For Model VRO-4Q: 1. Refer “Un-install Quick Connect Filter” on page 6, to remove 1st stage of filter (left one in front of the system). 2. Then, remove 2nd and 4th stage of filters. 3. Discard the filters in a proper manner. 4. Refer “Install Quick Connect Filter” on page 6, to install the new filters in the reverse order, install the 4th stage of the filter first, then 2nd stage and the last is 1st stage. 5. Go to step 7. For Model VRO-5Q: 1.
Post Carbon Filter Replacement (VRO-5Q only): The inline post carbon filter has a life expectancy between 6 to 12 months. The inline post carbon filter is an effective filter in removing any post taste and odor. Water Flow Direction Water Inlet Outlet 1. Turn off the inlet valve. Inline Post Carbon Filter 1/4” White 1/4” Blue 2. Close the ball valve of the storage tank. Tubing Tubing 3. Open the RO faucet to release the Filter Housing Bracket pressure in RO system.
Troubleshooting Guide for the RO Systems: Problem Possible Cause Solution Milky coloured water Air in system It’s a normal occurrence during initial start-up of the system.
Performance Data: Reverse Osmosis Drinking Water System Model: VRO-3Q, VRO-4Q and VRO-5Q The system must be installed and operated in accordance with manufacturer’s recommended procedures and guidelines. Failure to follow the instructions may result in the leakage, malfunction and will void warranty. Read this performance date and compare the capabilities of this unit with your actual water treatment needs.
Performance Data Sheet: The VRO-3Q and the VRO-4Q have been tested and certified by NSF International according to NSF/ANSI 42 and 58 and the VRO-5Q has been tested and certified by NSF International according to NSF/ANSI 58 for the reduction of the substances listed below. The concentration of the indicated substances in water entering the system was reduced to a concentration less than or equal to the permissible limit for water leaving the system, as specified in NSF/ ANSI 58.
Replacement Parts List: VRO-3Q 12 27 28 12 14 15 12 26 25 11 5 6 23 7 12 22 24 21 10 23 10 10 12 8 4 1 9 10 12 10 11 12 14 13 2 3 13 18 15 19 15 16 16 16 1 17 S/N Description 17 20 Part # S/N Description Part # 1 Storage Tank YY.VRO3Q-1 15 Small O-ring, Filter Housing YY.VRO3Q-15 2 Tank Ball Valve YY.VRO3Q-2 16 Big O-ring, Filter Housing YY.VRO3Q-16 3 6’ of 1/4" Yellow Tubing YY.
Replacement Parts List: VRO-4Q 12 13 10 11 9 11 11 14 30 16 15 6 11 17 19 18 7 11 9 18 5 8 19 11 4 20 11 18 4 9 11 18 20 9 11 11 3 9 2 21 22 18 3 21 21 23 25 23 23 26 24 24 24 11 16 24 1 30 31 27 S/N Description 28 29 28 Part # S/N Description Part # 1 Storage Tank YY.VRO4Q-1 16 Metal Bracket YY.VRO4Q-16 2 Tank Ball Valve YY.VRO4Q-2 17 Flow Restrictor, 300 mL YY.VRO4Q-17 3 6’ of 1/4" Yellow Tubing YY.VRO4Q-3 18 1/4" QC Elbow YY.
Replacement Parts List: VRO-5Q 10 12 12 11 13 11 14 11 9 11 11 19 18 20 12 12 16 11 15 11 12 5 6 12 7 11 4 17 8 21 21 22 21 23 26 11 26 11 25 26 24 25 25 16 2 3 25 16 30 31 S/N Description 27 28 29 28 Part # 1 S/N Description Part # 1 Storage Tank YY.VRO5Q-1 17 Flow Restrictor, 300 mL YY.VRO5Q-17 2 Tank Ball Valve YY.VRO5Q-2 18 Mounting Screw, Bracket YY.VRO5Q-18 3 6’ of 1/4" Yellow Tubing YY.VRO5Q-3 19 Metal Bracket YY.
Warranty: Limited Warranty: This limited warranty is extended to the original retail purchaser of this filtration system and warrants against any defect in material and workmanship for a period of one (1) year from the date of retail sale. GHP Group, Inc., at its option, will either provide replacement parts or replace the unit, when properly returned to the retailer where purchased or one of our service centers as directed by GHP Group, Inc., within one (1) year of retail purchase.