User guide

53
Issued June 20, 2007
M5000 Series: User Guide
Installing PMC Modules onto the PMC Carrier
FIGURE 6-3
Mounting
screws for the
PMC Carrier
Step 2: Install the PMC boards onto the PMC Carrier
1. Place the Mezzanine PMC Carrier on a smooth static protected work surface.
2. Install the PMC modules in the PMC Carrier.
PMC position #3 is the upper position
PMC position #4 is the middle position
PMC position #5 is the lower position.
3. Secure the PMC modules with screws from the bottom side of the PMC Carrier board.
PMC #5
PMC #4
PMC #3
PMC #2
PMC #1
Item 800
Item 800
Item 800
Item 807
Item 807
Item 807
Item 807
Item 800
Item 800
Item 800
Item 800
Item 800