Repair Manual
7
4051 - 1 - 1
03C2T02168
Z
0300 035H
09G
1004
472 AND 473
STILL STUCK
TO K2 HOUSING
512 STILL STUCK
TO BACK SIDE OF
K2 HOUSING
511
512
513
VALVE BODY ASSEMBLY (CONT'D)
COMPONENT REBUILD (CONT'D) TRANSAXLE FINAL ASSEMBLY
Continued on Page 101
44. Turn the valve body assembly over, as shown in
Figure 166, and install the five lower valve body
to upper valve body retaining bolts.
45. Torque lower valve body to upper valve body
bolts to 9 N·m (80 in.lb.).
46. Set the completed valve body assembly aside
for the final assembly process.
100
AUTOMATIC TRANSMISSION SERVICE GROUP
Technical Service Information
240 LOWER V.B. TO ACCUMULATOR HOUSING 2 BOLT (70 MM LENGTH).
241 LOWER V.B. TO UPPER V.B. BOLT (39.5 MM LENGTH).
242 LOWER V.B. TO UPPER V.B. BOLT (28 MM LENGTH).
Copyright © 2010 ATSG
91
07
T1
C0 07CA3 07 8
7 A 4C 3C007
0
A 35BY3 01 71
X 15B 3A0 706
5 B 0C 3B0 400
4A C0 0U3 01 0
240
241
242
Figure 166
Figure 167
Copyright © 2010 ATSG
472 NUMBER 9 THRUST BEARING.
473 NUMBER 9 "REAR" THRUST BEARING RACE.
511 K2 CLUTCH HOUSING ASSEMBLY.
512 NUMBER 11 THRUST BEARING.
513 NUMBER 11 THRUST BEARING RACE.
1. Position transaxle case as shown in Figure 167
and ensure number 11 thrust bearing race is still
installed in case.
Note: The B2 clutch piston, return spring and
snap ring should have been installed during
case component rebuild.
2. Ensure number 9 thrust bearing and race are still
in place and number 11 thrust bearing is still in
place on the K2 clutch housing and install the
completed K2 clutch housing into the transaxle
case, as shown in Figure 167.
WWW.ALL-TRANS.BY










