Owner's manual
P/N: 4GE020-010 v4.0, 2012-12-12
©2012 Vortech Engineering, INC.
All Rights Reserved, Intl. Copr. Secured
47
G. Secure the supplied remote battery terminal
relocation bracket to the existing stud on the
driver side strut tower using the supplied M6
nylock nut and washer as shown in Fig. 9B.
H. Snap the black remote battery terminal hous-
ing securely onto the bracket and reattach
the red cover. Pay special attention to the
battery cable routing, as it will have moved
and must be kept away from moving parts
such as the steering linkage, hot surfaces,
and sharp edges. See Fig. 9C.
I. Use a 1.5” piece of 5/32” vacuum line to
cover the OEM airbox stud on the front of the
driver side strut tower as shown in Fig. 9D.
Fig 9B
Fig 9C
Fig 9D
RELOCATION
BRACKET
FACTORY STUD