Owner's manual

P/N: 4GE020-010 v4.0, 2012-12-12
©2012 Vortech Engineering, INC
All Rights Reserved, Intl. Copr. Secured
50
A. Locate the 4GE139-096 PCV assembly.
B. Cut a 2” segment of the supplied 3/8” hose
and assemble it onto the end of the supplied
check valve with the FLOW arrow pointing
toward it. PROPER ORIENTATION IS
CRITICAL.
C. Assemble the remainder of the 3/8” hose
onto the other end of the check valve.
11. PCV VALVE INSTALLATION