User Manual
P/N: 4GE020-015 v1.0, 2010-05-24
©2010 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
17
G. LocatetheS/Cmountingplateandone.085"
longspacer,six3.566"longspacers,five
3/8-16x4.5”screws,one3/8-16x3”screw,
one3/8-16x6.25"screw,andtheirassociat-
ed washers. Position the hardware and spac-
ers in the plate as shown. See Fig 5E.
H. Removelooselyinstalled3/8-16x4.5”screw
from prior installation of P/S bracket.
I. Lower the supercharger plate into position,
making sure to start each screw into the
appropriateholewiththe3.566”spacers.
See Figures 5H & 5I.
Fig 5E
3/8-16 X 4.5"
3/8-16X4.5 BOLT
WITH .085" SPACER
3/8-16X3" BOLT
LOOSELY INSTALLED
3/8-16X6.25
LOOSELY INSTALLED