EN Technical documentation Check us on WG.US-Rev.2.8 (09.
WING W100-200 WING E100-200 WING C100-200 1. Table of content 1. INTRODUCTION ...................................................................................................................... 3 1.1. PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS ........................................ 3 1.2. TRANSPORT ................................................................................................................. 3 1.3. INITIAL STEPS TAKEN BEFORE THE INSTALLATION.........................................
1. INTRODUCTION 1.1. PRECAUTIONS, REQUIREMENTS, RECOMMENDATIONS Detailed analysis of this documentation, as well as assembly and use of equipment, according to the descriptions contained therein, and following all safety requirements, is the basis for the correct and safe operation of the device. Any other use that contradicts this instruction may cause accidents with serious consequences. Unauthorized personnel should have limited access to the device, while the personnel should be properly trained.
WING W100-200 WING E100-200 WING C100-200 2.3. STRUCTURE (WING 100-200) WING W100-200 – WATER AIR CURTAIN 1. Heat exchanger 2. Control system 3. Transverse fan 4. Casing 5. Outlet grille 6. Assembly jigs 7. Side cover 8. Side cap WING E100-200 – ELECTRIC AIR CURTAIN 1. Electric heaters 2. Control system 3. Transverse fan 4. Casing 5. Outlet grille 6. Assembly jigs 7. Side cover 8. Side cap WING C100-200 – COLD AIR CURTAIN 1. Control system 2. Transverse fan 3. Casing 4. Outlet grille 5. Assembly jigs 6.
EN The range of the air jet - installation height - Horizontal installation - Vertical installation fan speed III II I fan speed III II I height of installation [ft] H3 H2 H1 width of the door [ft] H3 H2 H1 WING W100, W150, W200 12 9-1/2 7-1/2 WING W100, W150, W200 12 9-1/2 7-1/2 WING E100, E150, E200 12 9-1/2 7-1/2 WING C100, C150, C200 13 9-1/2 7-1/2 WING C100, C150, C200 13 9-1/2 7-1/2 CAUTION! Air curtains with electric heat (models E100, E150 and E200) are not int
WING W100-200 WING E100-200 WING C100-200 3.2.1. HORIZONTAL INSTALLATION BY MEANS OF BRACKETS. It is possible to install the WING do the wall horizontally in two options: OPTION I: installation brackets with their arms faced upwards. In this option you should first screw the installation brackets to the wall (1) with intervals W1 for a 42in curtain (there are 2 installation handles) and W1, W2 for 62in and 82in curtain (there are 3 installation handles) so that the handles' arms are levelled.
3.2.2. VERTICAL INSTALLATION USING INSTALLATION BRACKETS. It is possible to install WING to a wall vertically on both sides of the gate (with the motor on the bottom or on the top). For this option it is not important if you screw the handles down to the unit first and then screw the whole down to the wall or first attach the handles to the wall and then screw the curtain down to the handles. To install the curtain vertically, use 1/4-UNC x 2 3/4 (outside the scope of VTS delivery) screws.
WING W100-200 WING E100-200 WING C100-200 VENTING OF DEVICE/DRAINING OF HEATING MEDIUM Venting of the curtain water coil followed by loosening the union connection on the outlet connection. In case of the vertical installation with the coils connection on the bottom side, the access to the vent valve is by removing the side cover. To do it one should remove the screws (1) around the cover and lift the cover. There is a valve (2) with a hose.
Recommended safety devices and wires WING E100-200 Device E100 E150 E200 WING W100-200 and WING C100-200 Device Supply voltage 1~240V W/C100 W/C150 W/C200 MCB 35A MCA 33.5A MOP 15 15 15 FLA 27.1A MCA 1.9A 2.8A 4.4A Power wire cross-section 3 x 10 AWG FLA 1.5A 2.2A 3.5A Fan supply voltage 1~240V Cable Nominal Voltage UL/CSA 600 V Supply voltage 3~240V MCB 25A 45A 55A MCA 20.5A 38.8A 49.8A FLA 16.7A 32A 40.
WING W100-200 WING E100-200 WING C100-200 Air curtains control • The motor is controlled by applying voltages in the range 0-10VDC to terminals Ai and G • The motor will not start when a voltage of 0-1VDC is applied to terminals Ai and G • The motor speed is controlled by changing the voltage supply to the terminals Ai and G in the range 1-10VDC. The value of the given voltage in a linear manner influences the motor speed in the range from 10-100% of its full efficiency.
4. ELEMENTS OF CONTROLS. Electrical connections can be carried out only by qualified electricians, according to the binding regulations of: ● industrial safety; ● installation instructions. ● technical documentation for each individual element of automatics. IMPORTANT! Before starting the controls installation, please read the operation and installation instruction for each of them. Instructions are included in the box for each control.
WING W100-200 WING E100-200 WING C100-200 6. SERVICING 6.1. PROCEDURE IN CASE OF MALFUNCTION WING W100-200/EHN Symptoms Leakage in the WING W100-200 heat exchanger What to check Description ● Fitting of the heat exchanger terminals, using two keys acting in two opposite directions (apply the keys on each terminal), which protects against the possibility of internal breaking of the collecting pipes. ● Relation between the leaking and a potential mechanical damage to the exchanger.
EN 8. TECHNICAL SPECIFICATION 8.1.
WING W100-200 WING E100-200 WING C100-200 8.2.
9. ELECTRICAL DIAGRAMS 9.1.
WING W100-200 WING E100-200 WING C100-200 9.2.
9.3.
WING W100-200 WING E100-200 WING C100-200 9.4.
9.5.
WING W100-200 WING E100-200 WING C100-200 9.6.
9.7.
WING W100-200 WING E100-200 WING C100-200 Complaint Form VTS America Inc.
Warranty card 1. Stamp of the company to carry out installation VTS America Inc. 3535 Gravel Springs Rd Ext #203, Buford, GA 30519 PH: 470-809-6811, FAX: 470-809-6815 2. Factory number of device 3. Place of installation 4. Date of installation 5. Address, street 6. Apartment number 7. City 8.