INSTALLATION & OPERATION MANUAL V SERIES FOOD HOLDING, TRANSPORT, AND PROOFER CABINET MODEL: VP18 ML-138089 For additional information on Vulcan-Hart or to locate an authorized parts and service provider in your area, visit our website at www.vulcanhart.com VULCAN-HART DIVISION OF ITW FOOD EQUIPMENT GROUP, LLC www.vulcanhart.com Vulcan ©2010 All Rights Reserved 3600 NORTH POINT BLVD.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL ELECTRICAL EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD STARTUP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL. FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITYOF THIS OR ANY OTHER APPLIANCE.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) TABLE OF CONTENTS IMPORTANT FOR YOUR SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 ELECTRICAL REQUIREMENTS . . . . . . . . . . .
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) GENERAL Carefully unpack and place in a work accessible area as near the installation position as possible. INTRODUCTION Vulcan-Hart Holding & Transport and Proofing Cabinets are produced with quality workmanship and material. Proper installation, usage, and maintenance of your cabinet will result in many years of satisfactory performance.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) CLEANING: The cabinet should be thoroughly cleaned prior to putting into service. Use a mild soap and water solution to clean the interior of the unit. Never use harsh chemicals or abrasive pads to clean the unit. See cleaning instructions in this manual. LOCATION: For efficient cabinet operation, choose a location that will provide easy loading and unloading without interfering with the final assembly of food orders. (Fig.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) electrician. Do not remove the grounding prong from this plug. Verify that the power source matches the Serial Data Plate located on the lower back corner of the cabinet and the plug configuration before the connection is made. (Fig.4) (Fig. 4) OPERATION Hold Indicator Light: The Hold Indicator Light indicates power is supplied to the cabinet and the cabinet is in Holding Mode. CONTROLS The Cabinet and its parts are hot.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET 6. PROOFING OPERATING INSTRUCTIONS Always disconnect power cord prior to adding water to the water pan inside the cabinet. Do not over fill water pan with water. 1. Plug in power cord to appropriate power source. 3. Switch Proof/Hold Switch upward to Proof position. The Proof Indicator Light should be lit. 4. At the proper setting, your proofer door will have a light haze of moisture on it.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) PROOFING GUIDELINE DOUGH PREPARATION REFRIGERATED DOUGH FRESH PREPARED DOUGH If Dough is Frozen: 1. Grease pan. Place frozen dough on pan and brush tops of dough with oil, cover dough lightly with a film wrap, and refrigerate until dough thaws and reaches 40⁰F (4 to 6 hours or overnight.) It is important during thawing that the tops of the dough product must not “crust” or dry out.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) 3. Switch the Fan switch to On if forced air holding is desired. The use of the fan is optional. Use of the fan keeps the temperature even throughout the cabinet. 4. Wait approximately 25 minutes for the cabinet to preheat. Once the cabinet has been connected to the appropriate power source, the cabinet is ready for operation. 5. Load Hot food pans with hot, cooked food into cabinet. 1.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET passive, protective film that shields against corrosion. CLEANING electrical cleaning. Always power supply F-41190 (09-10) unplug before If the protective film remains intact, the stainless steel will remain intact. However, if the film is damaged, the stainless steel can break down and rust. The Cabinet and its parts are HOT. Be very careful when operating, cleaning, or servicing the cabinet.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET If signs of breakdown appear, restore the stainless steel surface. First, thoroughly clean, rinse, and dry the surface. Then, on a daily basis, apply a high-quality stainless steel polish according to manufacturer’s instructions. F-41190 (09-10) To reduce heat tint, limit the exposure of equipment to excessive heat. MAINTENANCE Unplug electrical power supply before servicing the cabinet.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) TROUBLESHOOTING SYMPTOMS Cabinet not operating POSSIBLE CAUSES REMEDY Cabinet not connected to power source. Connect cabinet to power source. Check circuit breaker No power. Check GFCI Moisture problem. GFCI or Ground Fault Circuit Indicator tripped Shorted element Pinched/damaged wire. Damaged power cord. Cabinet is connected to power source, switch is ON, circuit breaker is ON, but cabinet is not heating.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET F-41190 (09-10) SPECIFICATIONS CAPACITY 18"X26" PANS 12"X20" PANS 18 36 DIMENSIONS SHIPPING WEIGHT ELECTRICAL EXTERIOR 25¼" W x 30¾" D x 71" H VOLTS WATTS AMPS LBS. KG. 120 2,000 16.7 220 100 Vulcan reserves the right to change materials and specifications without notice.
V SERIES HOLDING, TRANSPORT & PROOFING CABINET WIRING DIAGRAM 13 F-41190 (09-10)