INSTALLATION, OPERATION, SERVICE & PARTS MANUAL FOR STOCK POT RANGE MODELS VSP100, VSP200 & VSP300 MODEL VSP100 VULCAN-HART FORM 30780 (3-92) COMPANY, P.O. BOX 696, LOUISVILLE, KY 40201-0696, TEL.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS IMPORTANT FOR YOUR SAFETY THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL. POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS INSTALLATION, OPERATION, SERVICE & PARTS MANUAL STOCK POT RANGES MODELS VSP100, VSP200 & VSP300 INDEX PLEASE KEEP THIS MANUAL FOR FUTURE REFERENCE Your Vulcan Stock Pot Range is produced with quality workmanship and material. Proper installation, usage and maintenance of your range will result in many years of satisfactory performance.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS INSTALLATION NOTE: When installing this appliance, the bottom area of the range should remain open to allow air circulation for the gas burner. NEVER BLOCK THE BOTTOM AREA OF THE RANGE. Do not permit fans to blow directly at the range, and whenever possible, avoid open windows next to the range sides or back. Avoid wall type fans which create air cross currents within the room.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS After piping has been checked for leaks, all piping receiving gas should be fully purged to remove air. The gas inlet is located at the rear and lower left side of the range. To ensure maximum operating efficiency, the range must be connected with a gas supply line as large or larger ID (net inside diameter) than the 3⁄4" gas pipe inlet provided on the range. TESTING THE GAS SUPPLY SYSTEM Pipe gas supply to the range.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS ADJUSTMENTS Air Supply Pilot Adjustment Air supply is controlled by an air shutter on the front of each burner. Increase the air shutter openings until the flame on the burner begins to “lift.” Then close the air shutter slightly and lock it in place. A yellow streaming flame is an indication of insufficient air and can result in carbon accumulation in the flame chamber. To correct this condition, increase the air shutter opening.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS OPERATION CONTROLS Shutdown The burner is in two sections, controlled by two heavy duty infinite control valves. The center “Star” section (Fig. 2) is one separate burner with an input of 55,000 BTU/hr. It is controlled by the right burner valve knob. The outer circle of the burner (Fig. 2) is the other separate 55,000 BTU/hr input burner, controlled by the left burner valve knob. For daily shutdown, turn burner valves to OFF position.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS MAINTENANCE LUBRICATION All valves and thermostats must be checked and lubricated periodically. Contact your Vulcan-Hart authorized servicer. Contact personnel qualified to install and repair gas equipment for all other maintenance. SERVICE SHUTOFF VALVE PRESSURE REGULATOR The gas shutoff valve is located to the rear of the range and is used to shut the range down when gas components require servicing.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS REPLACEMENT PARTS LIST REPLACEMENT PARTS ORDERING The following information must accompany a replacements parts order or it cannot be filled. A. B. C. D. Model and style or serial number. Type of gas (natural or propane). Voltage and phase. Appliance finish, permafinish, stainless steel, etc (if applicable to part to be replaced). Use rating plate located on back of range to help you obtain the information listed above.
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS VSP100 STOCK POT RANGE – 10 –
STOCK POT INSTALLATION, OPERATION, SERVICE & PARTS VSP100 STOCK POT RANGE ITEM NO. NEW PART NO. OLD PART NO.
THIS PAGE INTENTIONALLY LEFT BLANK