User Guide

ELECTRIC COUNTER TOP TILTING KETTLES - SERVICE PROCEDURES AND ADJUSTMENTS
Complete Draining and Refill
NOTE: Appearance of fluid will no longer be clear
after usage in kettle.
1. Turn power switch off and set temperature dial
to lowest setting.
2. Open pressure relief valve until reservoir jacket
is completely vented.
3. Remove bottom cover as outlined under
COVERS AND PANELS.
4. Remove water level probe (LLCO) from kettle
as outlined in REMOVAL AND REPLACEMENT
OF PARTS.
5. Place kettle in full upright position and allow
fluid to drain into container. Remove 1/2" pipe
plug from reservoir jacket fill elbow (rear of
kettle) to facilitate draining and provide opening
for re-fill.
NOTE: Clean threads and apply sealant before re-
installing pipe fittings.
6. Tilt kettle and re-install water level probe.
7. To Refill.
A. Place kettle in full upright position.
B. Remove pressure gauge to allow reservoir
jacket to vent during fill procedure.
C. Insert funnel into the reservoir jacket fill
elbow. Slowly fill the jacket according to
the volumes listed in the table below.
RESERVOIR JACKET VOLUME
Model
Total Fluid
Volume (Qt)
Water
(Qt)
Heat Transfer
Fluid (Qt)
K6ETT 4.0 3.0 1.0
K12ETT 7.2 5.4 1.8
K20ETT 8.0 6.0 2.0
8. Install pipe plug and pressure gauge. Tighten to
prevent leaks.
9. Turn power switch on and verify low water light
is off. If low water light is on, there may be a
problem with the water level control circuit. See
troubleshooting.
10. Remove air from reservoir jacket as outlined
under VENTING.
11. Check kettle for proper operation and leaks.
12. Install covers.
F35496 (August 2009)
Page 18 of 28