Installation Sheet
WAC Lighting retains the right to modify the design of our products at any time as part of the company's continuous improvement program. JULY, 2016
waclighting.com
Phone (800) 526.2588
Fax (800) 526.2585
Headquarters/Eastern Distribution Center
44 Harbor Park Drive 
Port Washington, NY 11050
Central Distribution Center
1600 Distribution Ct
Lithia Springs, GA 30122
Western Distribution Center 
1750 Archibald Avenue 
Ontario, CA 91760
INSTALLATION INSTRUCTION
Tube Architectural - Ceiling Mount
DS-CD05, DS-CD06, DS-CD08
REFLECTOR REPLACEMENT
1. Remove panel assembly by loosening the xture screw and gasket, remove three chips to change reector. (FIG.4)
2. Replace your beam angle reector on panel and x the clips. (FIG.5)
LED REPLACEMENT
1.  Loosen the xture screw and gasket (FIG.6), remove the panel assembly (FIG.7).
2.  Loosen the LED holder and LED screws, carefully disconnect LED connector from driver connector and replace LED by 
  removing driver mounting screws. (FIG.8).
DRIVER REPLACEMENT
1.  Loosen the xture screw and gasket (FIG.9), remove the cover assembly (FIG.10).
2.  Loosen the LED driver screws, carefully disconnect LED driver connector from LED connector and replace driver by removing driver 
  mounting screws. (FIG.11).
COMPLETING THE INSTALLATION
To prevent moisture from entering the outlet box and causing a short, use clear caulking (i.e. indoor/outdoor silicone sealant) to outline the 
outside of xture plate where it meets the wall leaving a space at bottom to allow moisture a means to escape.
Remove three clips
Replace dierent
beam angle reector
Loosen the xture 
screws and gaskets
Loosen the xture 
screws and gaskets
Remove panel
assembly
Remove panel
assembly
LED holder
LED holder
Screws
Connector
LED
Put on reector
and x clips
FIG.4
FIG.6
FIG.9
FIG.7
FIG.10
FIG.8
FIG.11
FIG.5



