Installation Sheet

4/4
Feeding power to canopy:
1. Make sure the rail passes under, or
close to a junction box. Power may be
introduced at any point along the rail.
2. Loosen canopy screws and separate
canopy plate and base plate.
3. Remove a knock out and route wires
into the junction box.
4. Connect Black (hot) wire from building
to black system wire. Connect white-to-
white wires.
5. The green wire is the ground wire to be
connected with the ceiling ground wire.
6. Secure all connections with wire nuts
and tuck excess wire back into the
junction box.
7. Secure the base plate to the junction
box, with two screws through the slotted
holes.
8. Install the canopy to the base plate.
Power feed to rail:
1. Unscrew the cap ring
(counterclockwise).
2. Remove the power connector by pulling
straight down. (bottom screws are
factory installed do not remove).
3. Place rail into the power adapter, then
re- install the power connector.
4. Re-install the cap ring.
Wire diagram:
Junction box
Ground wires
Base plate
Canopy screw
Canopy
Power adapter
Flexrail1
Power connector
Cap ring