Installation Instructions
44 Harbor Park Drive
Port Washington, NY 11050
Tel: 516.515.5000
Fax: 516.515.5050
www.waclighting.com
Live End Electrical Feed Over a Junction Box
1. Make sure power is off.
2. Note the polarity indicator of the track. The live end can only be installed on one end. Brace the track end cap
(opposite the live end) against a solid surface, and insert live end. This is important to achieve good electrical
contact.
3. Position live end over center of junction box. Mark track-mounting holes.
4. Remove live end cover and pry out the knock out hole.
5. Use a canopy plate “CP”. Attach mounting plate to junction box. Note plate has threaded screw holes, the
remaining screw will fit in a slotted hole to permit positioning. The plate will protrude slightly beyond the junction
box, but will be covered when completed.
6. Connect neutral (white) wire to the silver screw terminal on the live end marked “N” and Hot (black) wires to the
brass colored screw terminal marked “A” on the live end.
7. Connect Ground wire to green wire or screw terminal on the live end. Tuck any excess wire back into the
junction box.
8. Replace live end cover and secure with screw.
9. Install the canopy cover to the canopy plate with one screw and the cut out facing the track length.
10. Mount track (see Track Mounting).
Use “T” bar clip for grid
ceilings.
Mounting Track
1. Raise track assembly to ceiling. Mark mounting hole
locations. Track support points should be not more than
4’ apart. Use a minimum of two support points for 2’ and
4’ track and three for 6’and 8’ track.
2. Drill ceiling holes suitable for the fasteners you intend to
use. Toggle wings (supplied) require ½ inch holes.
3. If additional holes in track are needed, drill 5/32” holes
through the centerline of track (locate holes at least 6” in
from track ends).
4. Insert bolts through track, and into the toggle wings,
tighten 2 or 3 turns.
5. Push toggle wings into ceiling holes. Do not fully tighten
toggle bolts until all electrical connections are made.