Instructions

05/05/05 Rev 1
Monorail mounting:
Rail can be installed on a flat surface, a sloped ceiling, or a suspended ceiling.
1. Use two standoffs for 4ft rail, and three for an 8ft section. Use additional standoffs to support
tightly curved sections.
2. If bending rail, do this at floor level, then raise to ceiling and mark the location of standoff
supports.
3. If rail cannot be raised, use a plumb line to mark location of stand offs on the ceiling.
4. For dry wall, drill holes and insert ceiling anchors (supplied) through standoff bases and then to
ceiling (shown). Tighten until snug.
5. For wood surfaces insert wood screws through
standoff basses and fully tighten.
6. Install standoff posts with rail adapters. Twist
clock wise to tighten.
7. To obtain proper alignment with mono rail
loosen the set screw near the top of the
standoff, (using a 1/16” allen wrench) adjust
then re- tighten.
8. Loosen the set screw in the rail adapter, so that
there is sufficient clearence to slip the rail
between the two halves.
9. Raise the rail to ceiling level and support it.
10. Starting from the center of rail, slip track
between the two halves of the rail adapter.
Using a 5/32” Allen wrench (supplied), tighten
the set screw (clockwise) until the rail adapter
seats firmly against both sides of the rail.
11. Repeat procedure for remaining standoffs.
STAND
OFF BASE
RAIL ADAPTER
STAND OFF
WITH
RAIL ADAPTER