Instructions / Assembly

Maintenance PD 2A / PD 3A
34 wc_tx001332gb.fm
c. Soak the foam element in clean engine oil until saturated. Squeeze out
excess oil.
6. Reinstall the filter elements and air cleaner cover.
Note: In the interests of environmental protection, dispose of waste oil and soiled
rags in accordance with environmental protection legislation.
5.4 Greasing the Connecting Rod Bearing
When
Grease the connecting rod bearing every 40 hours of operation or monthly.
Requirements
General automotive grease
Machine shut down
Procedure
Perform the procedure below to grease the connecting rod bearing.
1. Stop the engine.
2. Access the grease fitting of the connecting rod bearing through the access hole
(a).
3. Using a grease gun, pump grease into the fitting until new grease seeps out
between the bearing and the journal.