INCLUDED IH THE PACKAGE REAR iE |[ Freon vise | Base Left Side Panel Shelf Side Panel Left and Back Panel Middle Back Panel
[STEP 1 Preparing the door: « Insert the plastic ring (M) in the Door (08). « Fix the hinges (3) in the Door (08) with bolts (K), as shown In DETAIL 1. [ayes 2 « Fix the feet (12) under the Base (01) with bolts (A). « Apply the protective felt covers (L) on the bottom of the feet (12). « Apply the plastic covers (8) on top &— of the bolts (A). Le [sere 2 « Connect Shelves (05) into Partitions (04) and (05) with dowels (C) and bolts (D).
[sere 5 « Connect the Top Panel (02) onto Side Panels and Partitions (03), (04), (06) and (07) using dowels (C) and the Mini fix hardware Apply adhesive covers (G) on the mini fix hardware (F). lever a « Connect Back Panels (09), (10) and (11,) with nails (1). « Use metallic plates (H) and nails (1) at the Joining surfaces. Installing the door (08): Fix the hinge connectors (J) of the Door (06) on the Right Side Panel (07) with bolts 3.