Installation
Installation Guide
! WARNING - Turn off the power at the breaker box before starting any work.
Failure to do so can result in bodily harm.
We strongly recommend that a licensed electrician performs the installation.
Ensure that all safety and jurisdiction code is followed up to the highest standard.
Parts component list
1x
2x +
1 extra
1 1/8"
1
2 3 4 5
2x +
1 extra
3/4"
2x +
1 extra
1 1/8"
2x +
1 extra
6
2x
1/2"
Allen key 1.5mm
STEP 2
STEP 4
STEP 5
STEP 1
Turn off the power at the breaker box. Test that the power is off at
the ceiling junction box with a circuit tester.
Mark the position of the hanger's holes on your wall. Make sure they are
level.
STEP 3
Drill the wall holes for the plastic anchors (2).
Install the provided plastic
anchors into the holes you've just drilled. Mount the hanger with the 4
screws provided. The 3/4" screws (3) are screwed into your junction box.
The 1 1/8" screws (4) are screwed into your plastic anchors.
Connect the power and neutral wires using the provided wire caps.
Connect the white wire from the fixture to the neutral wire in your ceiling
junction box. Connect the black wire to the power wire in your ceiling
junction box. Connect the bare copper ground wire to the green screw
on the hanger.
Mount the fixture wall canopy to the hanger using the provided 1/2"
screws as shown.
Turn your power back on at the breaker box.
STEP 6
1
5
6 6
FRONT
VIEW
1
2
3
4
1
3
4
2
5