soft bed installation drawing Ti tangle medal 4 | Square metal % | Bed legs 4 Stammerer 132 Spacer 132 Blat legs B Hexagon spanner step: Put every part of the bed in tum. step: stall the: 4 small metals onto the holes of the comers. step. Install the 4 bangle metals onto the holes of the four corners. Step 4 in the:hammock. offend the:bed and bed side, the head of a bed joint Install the foot of the bed, step S: [stall slat legs onto the back of slat.