Installation Guide
! WARNING - Turn off the power at the breaker box before starting any work.
Failure to do so can result in bodily harm.
We strongly recommend that a licensed electrician performs the installation.
Ensure that all safety and jurisdiction code is followed up to the highest standard.
STEP 3
STEP 5
STEP 6
STEP 1
Turn off the power at the breaker box. Test that the power is off at
the ceiling junction box with a circuit tester.
Mark the position of the hanger's holes on your ceiling.
STEP 4
Drill the ceiling holes for the plastic anchors (2).
Install the provided
plastic anchors into the holes you've just drilled. Mount the hanger with
the 6 screws provided. The 3/4" screws (3) are screwed into your
junction box. The 1 1/8" screws (4) are screwed into your plastic anchors.
Connect the power and neutral wires using the provided wire caps.
Connect the white wire from the fixture to the neutral wire in your ceiling
junction box. Connect the black wire to the power wire in your ceiling
junction box. Connect the bare copper ground wire to the green screw
on the hanger.
Turn your power back on at the breaker box.
STEP 7
5
5
1
4x +
1 extra
2 3 4 5
2x +
1 extra
4x +
1 extra
2x +
1 extra
3
Installation Guide
Warranty Effective
Parts component list
1x
1
Mount the fixture ceiling canopy to the hanger by sliding the fixture cover
over the hanger where the 4 screws sticking out on the inside of the
canopy and the openings in the hanger meet and slide to the right to lock
into place, making sure the magnet also catches.
1
4 44 4
magnet
STEP 2
Remove the hanger from the fixture by sliding away from the magnet and
lifting it up.
magnet