Specifications
Enquiry Specification for Wagon Tippler with Side Arm Charger and Associated works
NRO/CON/WT/533
EPI – New Delhi Volume-2B, Rev.0 Page 11 of 63
4.0 DUST SUPPRESSION SYSTEM
The scope of work of dust suppression system includes:
(a) Plain water dust suppression (DS) system of wagon tippler hopper, track
hopper & stock piles.
(b) Plain water dust suppression system for plough feeders of track hoppers.
The dust suppression system shall be integral part of the plough feeders
and shall be captive unit of these mobile equipment.
Separate set pump (1W+1S) & water tank shall be provided for dust
suppression system of each plough feeder.
(c) Dry fog dust suppression system (DFDS) at material transfer points in
different junction houses, hoppers/bunker/bin buildings and other dust
areas.
(A) Applicable Codes And Standards
The execution of the work covered under this specification shall conform to the
latest Indian Standards specification where the same are available or the
reputed standards acceptable to the owner / consultant. In case such
specifications are not available, the work shall be according to good engineering
practice and norms acceptable to owner / consultant.
(B) Design Criteria
(1) Work zone dust concentration shall be less than 5 mg/Nm3 (at 5m to 7 m
distance from source) above ambient level .
(2) Water line velocity shall be maintained less than 1.5 m/sec. Water pipe line
shall be supported at regular interval. Make-up water, quick fill, drains and
overflow connection shall be included at pump station tank. Duplex strainer
shall be included at inlet to dust suppression system pumps. IS-1239 heavy
class, ERW, G.I pipe line ( for size up to 150 NB) shall be used in the water line.
The pipes above 150 NB shall be MS, spirally welded, 6 mm thick & conforming
to IS:3589. Water pipe line shall be preferably be laid over ground along
conveyor gallery. In case of non-availability of same suitable supporting
scheme shall be provided to suit site. Underground pipeline (wherever
provided) shall have wrapping and coating as per IS – 10221 (preferably
wrapping coating shall be coal tar based). Hume pipe protection shall be laid at
road crossing area.
(3) IS-1239 heavy class, ERW, G.I pipe line shall be used in the compressed air
line. Compressed air pipeline network over ground laying shall be preferred
with a minimum slope of 10 mm in 1m (1: 100) along flow and moisture trap
with drain provision at regular interval. Compressed air pipeline shall be
preferably laid along conveyor gallery or can be supported from building
supporting structure. In case of non-availability of same suitable supporting
scheme to be developed by the Bidder to suit site.
(4) In wagon tippler , spray nozzles shall be arranged in three rows, at both side of
hopper and top of hopper to cover the entire hopper. Water spray in each group
of nozzles shall be through solenoid valve. The operation (open/ close) of