Specifications
Enquiry Specification for Wagon Tippler with Side Arm Charger and Associated works
NRO/CON/WT/533
EPI – New Delhi Volume-2B, Rev.0 Page 2 of 63
GENERAL
The following Technical Specification shall be read in conjunction with General
Technical Specification (GTS) of Bhilai Steel Plant, SAIL and General
Specification. If there are any provisions in this Technical Specification, which are
at variance with the provisions of General Technical Specification (GTS) of Bhilai
Steel Plant, SAIL and General Specification, the provisions in this Technical
Specification shall take precedence.
1.0 DOCUMENTS/ INFORMATION TO BE FURNISHED ALONGWITH
OFFER.
(i) Clear Scope of supply.
(ii) Exclusions, if any.
(iii) Type and quantity of oil, lubricants & consumables for initial fill till successful
commissioning of equipment.
(iv) List of Commissioning spares and start-up spares with unit rates.
(v) List with unit rates of special tools and tackles, if any required.
(vi) Price Schedule for equipment & erection work as per the format enclosed.
(vii) List of recommended spare parts for 3 years trouble free operation and
maintenance alongwith unit rates as per the format enclosed in price schedule.
(viii) Technical Data sheets duly filled by the vendor (blank data sheets enclosed).
(ix) Weight of the equipment in Kgs.
(x) Catalogues/ Leaflets and O&M Manuals.
(xi) Copies of G. A. Drawing of the equipment/ System.
(xii) Reference list of your Customers for the similar supply of items.
(xiii) Quality Assurance Plan.
(xiv) Unpriced Copy
(xv) Wagon Tippler - PLC interface details for communication with main plant PLC.










