Specifications
Enquiry Specification for Wagon Tippler with Side Arm Charger and Associated works
NRO/CON/WT/533
EPI – New Delhi Volume-2B, Rev.0 Page 32 of 63
1. Log sheets indicating daily/hourly recordings of power system
parameters to be noted down by customers operating personnel. The
parameters shall indicate loading of various electrical equipment
quality of power supply, energy consumption of various units, energy
consumption and maximum demand of the plant.
2. Preventive maintenance schedule for equipment.
3. Procedure for shut down and energisation.
4. Safety procedures for safe operation of equipment and complete
system.
5. Specification of equipment installed.
6. Test procedure for site tests.
7. All as built drawings.
8. Spares list for each equipment for 2 year operation and
maintenance.
9. Soft copies of all as built drawings along with hard copies shall be
submitted during commissioning.
(Vii) LIST OF DRAWINGS & DOCUMENTS (Automation)
Following drawings and documents shall be submitted by the Bidder:
(a)To Be Submitted Alongwith Offer
1. System configuration diagram for the Automation system along with its
peripherals. Configuration should indicate nos. of Processors &
interfacing details with plant PLC.
2. Bill of quantities of all hardware & peripherals viz; CPU, I/O units,
communication & power supply modules, operator/engineering stations,
bus cables & erection accessories etc. offered for the automation system
with brief specification.
3. Detailed technical catalogues & a write-up explaining the system offered
shall also be submitted along with details of various software being
considered.
4. Total power requirement & heat load for automation system.
5. List of commissioning spares with details.
6. List of two years operation & maintenance spares with details & unit rates.
(b)To Be Submitted By The Successful Bidder During Detailed
Engineering
(I) FOR APPROVAL:
1. Finalised system configuration diagram for the automation system
along with its peripherals with list of hardware and write-up on the
system.
2. Bill of Materials & Data Sheets of all the hardwares i.e. Processors,
Communication modules, Power supply cards, RLM, OLM, Operator
stations, Eng Stations, Servers, Bus cables etc.