Product Manual

Table Of Contents
765-4102/0100-0000 Installation and Removal
Product manual | Version: 2.1.0 53
8PORT IOL-B FLD PN DC 24V 2.0A
8Installation and Removal
8.1 Installation
8.1.1 Tools Required for Installation
The following tools are required for installation:
Allen wrench for the M4 hex head mounting screws
The following additional items are only required for installation where no threaded hole is
present:
M4 thread cutter (bottoming tap or hand tap set)
Drill (for pre-drilling mounting holes for the module and installing the system)
You also need two M4 cylinder head hex screws per DIN 912 / ISO 4762 of adequate
length.
8.1.2 Before Installation
Always note the following information:
The product must only be installed and put into operation by qualified electrical special-
ists per EN 50110‑1/-2 and IEC 60364.
Observe the safety information in section 8Safety [}11].
Before installation, check the product for damage, such as transport damage. Dam-
aged products must not be put into operation.
8.1.3 Installation Instructions
Note the following for selection of the installation location:
Install the product in such a way that it is protected against weather exposure (no di-
rect sunlight; no salt water or spray).
Note that the module should not be installed in the immediate vicinity of objects or de-
vices that can get hot. For a high level of module utilization, the temperature-depen-
dent operating range can be extended by installing metal surfaces or profiles or the
like, or by installation in a ventilated outdoor environment. The modules’ internal tem-
perature measurement can be used for optimization.
Screw the product down only on flat contact surfaces to protect it from mechanical
warping.
To protect the product from tensile forces that may arise, do not bridge spaces with it.
To avoid damaging the product, do not mount it in shearing zones of moving devices.
Furthermore, lay the cables in such a way that they cannot get into the shearing zone
of movable equipment parts.
Leave sufficient space for easy product replacement and for hooking up the pluggable
connections.
Ensure that the requirements on the product concerning exposure to vibration and
shock are met at the installation location.
Install the product in such a way that the product’s diagnostic LEDs remain visible.
Note the following concerning the installation procedure:
Disconnect the power supply from the system before beginning mounting
Ensure sufficient potential equalization in your system