Instruction manual
7
FI
G
URE 1
RECOMMENDED INSTALLATION
INTERMITTENT SAMPLING
Install accessories
either vertically or
horizontally, per
manufacturer's
instructions.
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or Solenoid
Valve
Flow
Control
Valve or
Orifice Union
CONDUCTIVITY
ELECTRODE
¾" TEE
2 ft.
minimum
1 to 3 ft.
maximum
10 ft. max.
with minimal valves, elbows & unions
To Drain
Skimmer Blowdown Line
3/4" Min. up to Electrode
Full Port Block
Valve
Manual Blowdown
(Normally Closed)
Motorized
Ball
or
Solenoid
Valve
Flow
Control
Valve
or Orifice
Union
CONDUCTIVITY
ELECTRODE
¾" TEE
Flow
Control
Valve or
Orifice Union
FIGURE 2
RECOMMENDED INSTALLATION
CO
NTIN
UOUS
S
AMPLIN
G
TO
DRAIN
To Drain
To Drain
Boiler Controller
www.walchem.com
PREV NEXT
ENTER
EXIT