Instructions / Assembly

Installation & Assembly Instructions
Please contact our Customer Service Division with any questions at:
support@tritonproducts.com
1 INLBD2122
Read all instructions completely before installing. Should you have any questions about your installation, please call
Customer Service at 440-248-5480
Boards can be positioned side by side or in separate location in vertical or horizontal mounting positions.
Pegboards fasten directly to concrete, solid wood and hollow wall structures without the use of furring strips.
PegBoards are designed with internal mounting flanges that keep mounting hardware hidden from sight and add
to the board’s structural integrity and holding power.
If installing to bare studs you will need to install wood headers before completing installation.
Mounting hardware included.
Items included in WallCommand kit: 2) 18” x 36” Steel Pegboards 1) Multi-Prong holder, 1) Multi-Ring holder,
2) 4” single rod 30 degree bend, 2) 6” single rod 90 degree bend, 2) 5-3/4” double rod 80 degree bend, 4) 1” single
rod 30 degree bend, 3) 2-1/4” curved, 4) 3 single rod 30 degree bend, 3) 3” double rod 90 degree bend, 2)
extended spring clips, 2) standard spring clips, 2) closed end hammer/plier holders and mounting hardware.
Tools needed for Installation
Level, marker, 7/32” standard or masonry drill bit, 7/64” drill bit for wood studs, #2 Phillips head screw driver,
power drill.
LocBoard Installation:
For drywall, hollow concrete wall installation: Use (12 each) plastic drywall anchors and #8 Phillips head wood
screws (SUPPLIED WITH THIS SYSTEM). If installing to bare studs you will need to install wood headers before
completing installation using wood screws only. NOTE: Always install one board at a time.
1. (IMPORTANT SAFETY INFORMATION!) Select wall location for your LocBoards and the desired vertical or
horizontal mounting pattern you wish to mount in. When selecting a location for mounting always make sure that
mounting locations do not fall in line with, are adjacent to or interfere with any internal or external electrical
wiring, wall mounted or built-in electrical appliances, heaters, gas lines, ductwork or plumbing inside of wall, or
are located on the opposite side of any wall surface from where you are mounting. If you are unsure, please
consult a professional before proceeding with installation.
2. There are three screw holes in each mounting flange on the back of your LocBoard that are accessible through the
square holes on the front (see images on back).
3. Place one LocBoard with mounting flanges flat against wall surface, while using a level to make sure your board is
straight and squared. Mark the centers of all 6 screw holes onto your wall surface. Note: Installation for first board
should be completed before marking mounting holes for the second board.
4. Pre-drill holes for #8 wall anchors marked in Step 3 using 7/32" standard or masonry drill bit depending on wall
surface. If you hit a wood stud stop drilling and using a 7/64” drill bit create a pilot hole for the wood screw, Note:
avoid over-drilling holes. (Plastic wall anchors should fit snug.)
5. Insert plastic wall anchors in each hole drilled in Step 4 except where you drilled 7/64” pilot hole for wood stud.
6. Align mounting holes in wall surface with screw holes in back flanges. Insert wood screws through the front square
opening and into pre-installed plastic wall anchors. Tighten all screws. The head of each screw should not be visible
and will be tight against inside surface of each mounting flange.
7. Repeat Steps 2-6 for second LocBoard installation.
Hook Installation: Insert hooks back locking tabs into front square openings of tool board, slide securely into
place and complete by installing the required number of LocScrews.
Wall Command™ Instruction Sheet for Wall Mounting

Summary of content (2 pages)