BX52S ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. Please Read and understand the Assembly Manual and all safety signs before starting. EMB MANUFACTURING INC. 4144 BOOMER LINE ST. CLEMENTS, ON N0B 2M0 CANADA PH: (519) 699-9283 FAX: (519) 699-4146 Refer to the operators manual for safe operation and maintenance Z97562 BX52S 3PH AssyManual.
Z97562 BX52S 3PH AssyManual.120615 1.0 WALLENSTEIN by EMB Mfg. ASSEMBLY SAFETY Read and understand the Assembly Manual and all safety signs before starting. 1. 2. Follow good safety practices: - Keep service area clean and dry. Be sure electrical outlets and tools are properly grounded. Use adequate light for the job at hand. 3. Use properly sized tools, stands, jacks and hoists at all times. 4. Don’t' handle heavy and/or bulky components alone, ask for help. 5.
Z97562 BX52S 3PH AssyManual.120615 3.0 WALLENSTEIN by EMB Mfg. MAIN COMPONENTS Weldment, Folding Hopper Discharge Chute, BX52 #5 Global PTO Shaft M10 Shear Weldment, Upper Rotor Housing 4.
Z97562 BX52S 3PH AssyManual.120615 5.0 WALLENSTEIN by EMB Mfg. ASSEMBLY This assembly manual is for the BX52S Chipper. The machine is shipped from the factory in a partially disassembled configuration and attached to a pallet that provides easy moving and handling. Always use tools, equipment and fork lifts of appropriate size and capacity for the job. Inspect for damage from shipping, immediately contact the shipping company if damage is found.
Z97562 BX52S 3PH AssyManual.120615 WALLENSTEIN by EMB Mfg. 6. Remove the PTO shaft from the skid and place in a safe area 7. While some one is holding the discharge chute: • carefully remove the 4 nuts & bolts that hold the discharge chute to the shipping bracket. (this hardware is not needed and can be discarded) • Set the discharge chute aside in a save place for later assembly • keep the spacer and hood capture rings with the discharge chute assembly 8.
Z97562 BX52S 3PH AssyManual.120615 WALLENSTEIN by EMB Mfg. 9. Remove the remaining 4 nuts and bolts on the chute shipping bracket, remove and discard the bracket, keep the hardware, (it is required to mount the chute to the chipper body) but the hardware with the other chute nuts and bolts. 10. Remove the 2 x nuts and bolts that are stored on the flange of the chipper hopper opening, keep the hardware, it is needed to mount the hopper to the chipper body. 11.
Z97562 BX52S 3PH AssyManual.120615 WALLENSTEIN by EMB Mfg. 13. Release the spring latch pin and carefully fold open the hopper, engage the spring latch to lock the hopper into open position. 14. Insert and fasten the remaining nut and bolt for the hopper. 15.
Z97562 BX52S 3PH AssyManual.120615 WALLENSTEIN by EMB Mfg. 16. Finally, install the implement pins into the mounting holes on the chipper body % % Congratulations on successfully completing assembly of the BX52S Woodchipper Pre-Delivery Inspection Inspect for damage from shipping, immediately contact the shipping company if damage is found.