Installation Guide
MODULAR STORAGE KIT
6’
21’’
Grid
24’’
Long Rail
40.8’’
Long Rail
19’’
Grid
GETTING STARTED 
WITH WALLTECH 
MODULAR STORAGE
Measure your area to determine height and width of your 
space. Then use the grid below to draw your custom layout. 
The Walltech rail and grid system allows you the exibility to t 
any space.
Plan Your Space
Follow these simple steps to install your rails and grids. The 
Walltech patented system makes it quick and easy.
Installation
TOOLS REQUIRED:
• Drill    • Stud Finder  • Pencil  • Tape measure 
• Fasteners (See packaging for details)
2
3
Find stud. 
Position rail 1 
and screw in 
place. Do not 
tighten.
Using rail 1 as 
a guide, swing 
it across.
Mark using 
magnetic level 
supplied.
1
Rail System
5
6
Fix rail 2 in 
place.
Attach shelf sup-
plied to mid way 
down both rails. 
This will give cor-
rect distance at 
bottom of rails.
Tighten all 
screws and  
secure.
4
Find stud. Screw 
into top Center 
hole. Position 
grid in place 
plumb.
Use the magne-
tic level supplied 
to square up
the grid.
2
1
Grid System
Screw into all 
the holes of the 
grid and tighten 
for additional 
security.
Clip on the 
accessories.
3
4
INCLUDED
MAGNETIC 
LEVEL
CIE customerservice@cie-namerica.com
1-800-269-0818
D5942434-02E


