Use and Care Manual

MODULAR STORAGE KIT
6’
21’
Grid
24’
Long Rail
40.8’
Long Rail
19’
Grid
GETTING STARTED
WITH WALLTECH
MODULAR STORAGE
Measure your area to determine height and width of your
space. Then use the grid below to draw your custom layout.
The Walltech rail and grid system allows you the exibility to t
any space.
Plan Your Space
Follow these simple steps to install your rails and grids. The
Walltech patented system makes it quick and easy.
Installation
TOOLS REQUIRED:
• Drill • Stud Finder • Pencil • Tape measure
• Fasteners (See packaging for details)
2
3
Find stud.
Position rail 1
and screw in
place. Do not
tighten.
Using rail 1 as
a guide, swing
it across.
Mark using
magnetic level
supplied.
1
Rail System
5
6
Fix rail 2 in
place.
Attach shelf sup-
plied to mid way
down both rails.
This will give cor-
rect distance at
bottom of rails.
Tighten all
screws and
secure.
4
Find stud. Screw
into top Center
hole. Position
grid in place
plumb.
Use the magne-
tic level supplied
to square up
the grid.
2
1
Grid System
Screw into all
the holes of the
grid and tighten
for additional
security.
Clip on the
accessories.
3
4
INCLUDED
MAGNETIC
LEVEL
CIE customerservice@cie-namerica.com
1-800-269-0818
D5942434-02E

Summary of content (2 pages)