Installation Manual

16
APPENDIX G:
SNOW MELT DIAGRAM 277V - TYPICAL LINE DIAGRAM (FOR 12 CIRCUITS/CABLES) WITH PREMIUM CONTROL
AIR-SS
LOW VOLTAGE (24V)
LOW VOLTAGE (24V)
Slab mounted temperature probe sensor
for high temp cut-off, to be housed inside
a 3/4” rigid metal conduit between two
passes of heater cable.
Aerial mounted snow sensor location
as per the installer.
SCP-120
CONTROLLER
LOW
VOLTAGE
(24V)
REMOTE
CONTROL
OVERRIDE
277V CIRCUITS
120V
SWITCHED
POWER
Heater cable 50ft cold leads to be taken through
3/4” (19mm) rigid metal conduit back to J-boxes.
Installer may use more J-boxes
outside or inside building.
277V CIRCUITS
J-BOX
J-BOX
HEATER CABLE / MAT #1
HEATER CABLE / MAT #2
HEATER CABLE / MAT #3
HEATER CABLE / MAT #4
HEATER CABLE / MAT #5
HEATER CABLE / MAT #6
277 VAC
BREAKER PANEL
RLY-12PL
RELAY PANEL
OutsideInside
120 VAC
BREAKER PANEL
J-BOX
J-BOX
HEATER CABLE / MAT #7
HEATER CABLE / MAT #8
HEATER CABLE / MAT #9
HEATER CABLE / MAT #10
HEATER CABLE / MAT #11
HEATER CABLE / MAT #12
120V
CONTROL
POWER
(conduit size as per installer / local code requirements)