Installation & Assembly

STEP 1 STEP 2 STEP 3 STEP 4
Install Wood Sleepers
Install wood sleepers (strips of wood 1”
to 2” wide and 3/8” to 1/2” high) 19” apart
across the entire plywood suboor leaving
appropriate space for any planned cuts and
turns. The sleepers are installed to create
lanes into which the 18” wide warming
system roll will be placed.
Lay The Cable
Heating System)
Lay the oor heating system into the 19”
lanes created by the sleepers.
Cover Rolls with Self
Leveling Cement
Once the system is in place, the warming roll
should be covered with self leveling cement
up to and even with the top of the wood
sleepers.
Install Hardwood
Flooring
Once the self leveling cement has dried and
cured to the manufacturer’s specications
the hardwood oor can be installed by nailing
it into the wood sleepers. Be careful not to
place nails or staples near to the system’s
heating cable or power leads.
Nailed Hardwood Flooring - Installation Guide
14