User Guide

987604A1.doc Page 44 of 48
8. Use 2 Retaining Rings to lock Power Cord
with the Plastic Housing in opposite
direction.
9. Install Rocker Switch to Right Plastic
Cover and connect corresponding lead
Wires.
2.9.3 INSPECTION OF WIRING
Visual Inspection.
Ensure that Switches have assembled correctly. Wiring is complete match the drawing and
pin-out table for corresponding switch.
Ensure that Wiring has not jammed in Housing. Direction Switches slider assembled
correctly.
Ensure green Ground wire is securely attached to chassis.