F4 0001 IG

Table Of Contents
MODEL: F4-0001
B) SPOUT AND HANDLES INSTALLATION
1) Once your finished wall has been completed, slide the decorative ring onto
the base of the spout. Attach the spout to the installed valve body. Once in
place, tighten the set screw underneath to secure.
2) Thread escutcheons onto the stem until hand-tight.
Ensure the rubber washers remain seated on the escutcheons.
3) Attach the hot and cold handles to the valve stems.
Ensure the hot handle is on the left, and the cold is on the right.
C) FINAL CHECK
1) Ensure all connections are tightened properly.
2) Turn on main water supply.
3) Turn on both hot and cold water for 2 minutes.
4) Check for leaks.
5) Remove the aerator cap and ae
rator, check for debris, clean if necessary.
6)
Reinstall aerator.
4) Drill holes size as below for valve body on the finished wall.
FINISHED
WALL
1-1/4 (32mm), MAX 1-3/4 (45mm)
4
(102mm)
4 (102mm)