Installation Guide

MODEL: WO-0001
A. Seal the overow drain pipe (7)(8) rst, mount it to back side of tub wall.
Use the thick washer (10) to prevent any water leakage.
B. Fasten the grid (11) to inside wall of the tub by lining the hole up with the
threads and screw down ll ght.
C. Slide the lock nut (2) and washer (3) onto overow drain pipe, connect it
with drain body (5)
D. Seal the boom drain pipe (6)(9) , slide the nut and washer onto it and
connect with drain body. Line up t
he drain piece with the drain hole in the
tub. Do the same for boom tail piece (4).
E. Loosen screw from side of li plug (15), install the tub shoe (14) with gasket
(13) through the top of the drain hole, screw down unl ght.
F. Reinstall the li plug, line the screw hole up with the at side of the stem
scking up from the drain, and ghten the screw in all the way.
G. Aer all components are installed place the base flange (1) over the bo
om
tail pipe before connecng to the waste plumb line. Connect the waste and
overow to plumb lines in the oor. Check for any leakage in the assembly.
Note:
Use Teon tape on all threaded connecons
Measure twice cut once

Summary of content (1 pages)