Owner`s manual

9. Connect the pH, ORP and Flow sensor cables to the controller unit as labeled.
Sensor cables are constructed from a specialized material - never cut or splice.
10. If new or additional chemical feeders are to be used with the controller, install
according to manufacturers instructions at this time.
11. Connect chemical feeders to the controller as labeled.
12. Check all electrical and mechanical connections. Resume filtration system
operation and check for any leaks.
Prepare Tubing:
Cut tubing squarely
and remove any
burrs. Mark tubing
3/4" from end. This
is the insertion mark.
Insert Tubing
Insert tubing straight
into fitting until it
bottoms out and
insertion mark is no
longer visible.
To Release Tubing:
Push collet toward
fitting body and pull
on tubing to release.
Repeat steps 1 and 2
to reuse fitting.
BODY
COLLET
TUBING
O-RING
WORKING WITH TRU-SEAL FLUID CONNECTIONS FOR A FAST, PROFESSIONAL INSTALLATION
INFLUENT
SAMPLE
STREAM
ORP
FEED
EFFLUENT
POWER
CORD
pH
FEED