Instructions / Assembly

Note: One hose can be used, if two lines are not available, however, we
recommend using two for greater flow.
3. Using a pointed shovel or spade, remove a small (12” dia.) section of turf
in the location of the first well. Turn on water flow and elevate the 2” casing
to a vertical position. Using a back and forth rotating motion and slight
downward pressure, begin to wash the casing into ground. The water
should wash sand, gravel and debris up to ground level along the outside
of the casing. Do not rush or force the casing down. As necessary, add
lengths of 2” casing, using only inside flush couplings and move the DIY
Install Kit to top of each section.
4. During this procedure, changes will be observed in the color and texture
of the material being washed-up around the outside of the 2” casing. This
occurs as various ground formations are passed through. As the water
bearing layer is entered, this flow will often diminish or stop entirely. This
is due to some or all of the water being absorbed by the well. If at this
point, the 2” casing cannot be moved further into the well, because of
diminished digging action, it will be necessary to remove the 2” bushing
from the DIY Install Kit and continue by threading on a ¾” PVC FPT x Slip
coupler and pushing onto ¾” PVC pipe. You will then push the ¾” PVC pipe
inside the 2” casing.
Photo #1 Photo #2