Specifications
36
ENVISION COMMERCIAL SPECIFICATION CATALOG
Vertical Dimensional Data
Rear Air Discharge
Overall Cabinet
Water Connections
Return Connection
using std deluxe filter rack (±0.10 in)
Vertical 1 2 3 4 5 I J K
Models A B C D E F G H
Loop
1/2" cond 1/2" cond 3/4" cond L M N O P Q R S T U
Width Depth Height* In Out HWG In
HWG
Out
Cond-
ensate
Water FPT HWG FPT
Low
Voltage
Ext Pump
Power
Supply
Filter Rack
Width
Supply
Width
Supply
Depth
Return
Depth
Return
Height
Discharge Connection
duct flange installed (±0.10 in)
Electrical Knockouts
Condensate is 3/4" PVC female glue socket and is switchable from side to front
Rev.: 05/30/07 B
Vertical unit shipped with 1" (field adjustable to 2") duct collar/filter rack extending from unit 3.25" and is suitable for duct connection.
Discharge flange is field installed and extends 1" (25.4 mm) from cabinet
022-030
in. 22.5 26.5 48.4 2.3 5.3 13.4 16.4 9.6 3/4" 1/2" 5.1 10.8 12.8 2.2 9.5 10.4 8.5 6.5 2.3 22.0 26.0 2.0
cm. 57.2 67.3 122.9 5.8 13.5 34.0 41.7 24.3 19.05 mm 12.7 mm 13.0 27.4 32.5 5.5 24.1 26.4 21.6 16.5 5.8 55.9 66.0 5.1
036-072
in. 25.5 31.2 58.4 3.0 5.3 15.9 18.9 10.6 1" 1/2" 5.6 11.4 13.4 2.2 13.3 13.6 9.1 8.1 1.6 28.1 34.0 1.7
cm. 64.8 79.2 148.3 7.6 13.5 40.4 48.0 26.9 25.4 mm 12.7 mm 14.2 29.0 34.0 5.5 33.8 34.5 23.1 20.6 4.1 71.4 86.4 4.3
37.0
94.0
43.4
110.2
Legend
AP Alternate Service Panel
BP Blower Service Panel
CP Control Access Panel
CMP Compressor Service Panel
D
E
H
F
G
I
J
K
6
2
5
3
4
BP
CP
AP
AP
AIR COIL
FRONT V EW
Right Return
L
C
Q
B
O
N
M
REAR V EW
Right Return
L
C
B
P
O
N
M
REAR V EW
Left Return
BP
CP
Power Supply
3/4" ( 9 mm)
HV Knockout
/2" ( 2 mm)
LV Knockout
2ft [61cm
Service Access Points
Primary
Secondary
S DE V EW
Right Return
T
C
U
R
S
H
A
00
3
AIR COIL
AP
FRONT
5
S DE V EW
Left Return
T
U
C
RS
A
00
I
J
K
AIR COIL
CMP
FRONT
Power Supply
3/4" ( 9 mm)
HV Knockout
/2" ( 2 mm)
LV Knockout
FILTER RACK CONNECTIONFILTER RACK CONNECTION










