Installation Guide

3
STEP FIVE
Look under your tub. The rails should be approximately 1/2” off the floor. The space between
the tub bottom and floor must be completely filled with mortar and the mortar covered with
plastic sheet in step six.
STEP SIX
Take the tub out of the cabinet and place enough mortar onto the floor in the area under the
bottom of the tub to completely fill the space you saw in step five. This is usually 2” to 4”.
Cover mortar with 3 to 5 mil plastic sheet to allow the tub to be removed in the future.
NOTE:
The tub’s weight (including bather
And water) must be fully supported
by the mortar under the tub’s bottom-
not the tub lip that rests on
cabinet tile.
STEP SEVEN
Place the tub back in cabinet and push downward until tub lip rests evenly on top of cabinet,
Area between the tub bottom and the floor is filled completely, and the mortar squishes out
around the tub’s bottom.
WARNING!
DO NOT GET INTO TUB FOR ANY REASON UNTIL
MORTAR BED HAS CURED COMPLETELY AS YOUR TUB
COULD BE DAMAGED AND VOID OUR WARRANTY.
QUESTIONS?
PLEASE CALL: 1-800-289-8827 FOR ASISTANCE