Installation Guide

2
INSTALLATION INSTRUCTIONS
WATERTECH RECOMMENDS THAT MOUNTING CABINET AND
FINISHED MATERIALS NOT BE CONSTRUCTED AND INSTALLED
PRIOR TO RECEIVING YOUR TUB.
STEP ONE
Place the tub on a flat level surface and measure from the bottom of the tub lip to the floor at
locations indicated in the drawing below.
OWNER/INSTALLER BEARS FULL
RESPONSIBILITY TO MAKE SURE
THE BATH WILL FIT THE CABINET
CONSTRUCTED FOR THE TUB
AND ALL INSTALLATION INSTRUCTIONS
ARE FOLLOWED.
STEP TWO
Add ½” to the largest measurement.
STEP THREE
Construct the cabinet the tub will sit in using the dimension from step two. The cabinet top must
be level in all directions and the cabinet depth be measured from the top of the finish material
(tile, stone, Corian, etc.) to the floor.
STEP FOUR
Place tub in cabinet,
check for fit, and make
final adjustments.
MAKE SURE THE TUB
WILL FIT IN THE ROUGH
OPENING BEFORE
INSTALLING THE
FINISHING MATERIALS.