Manual

Amelie Concealed Tub Filler With Cross Handles
7/03
WATE RWORK S
These guidelines have been prepared for the professional contractor to aid in the installation of:
AMELIE CONCEALED TUB FILLER WITH CROSS HANDLES
(AMTU09)
All dimensions are based on original specifications and are subject to change and variation.
Please consult your Design Associate for current specifications.
Installation Guidelines
Figure 2
Index Ring
Index
Washer
Handle Screw
Handle
Stem Extension
Cover
Escutcheon
Escutcheon Gasket
Lower Gasket
Metal Washer
Locking Nut
Valve Body
Washer
Valve Stem
1
Escutcheon
Escutcheon gasket
Gasket
Metal washer
Locking nut
Figure 1
Figure 3
3
7
/
8
"
1
3
/
4
"
1
7
/
8
"
max
9
1
/
2
"
Ø
2
1
/
4
"
Ø
2
1
/
4
"
Ø
3
1
/
8
"
10" - 12"
9
1
/
8
"
5
7
/
8
"
Ø
2
3
/
4
"
10"
3
/
4
" male
NPT
72" hose
23
5
/
8
" long
flow restrictor/non-return valve
1
7
/
8
max
Notes:
• Drilling hole sizes:
spout and handshower: 1
1
/
4
"
side valves: 1
1/
2
"
• Must have an access panel for servicing
• Consult your local building codes for
anti-scald requirements
Aerator
Aerator
housing
Tee
assembly
Locknut
Metal
washer
Escutcheon
Spout
Gasket
Escutcheon
washer
Lift
rod
NOTES
Use only a protected, smooth-jawed, or strap wrench on any finished surface.
For proper installation, the deck surface should be installed prior to mounting
the mixer.
It is recommended that an access panel be provided for future servicing.
Check the specifications (left) for drilling hole sizes.
Run
3
/4" supply lines for maximum water flow.
Accessible shut-off valves, which will facilitate servicing, are recommended for
the hot and cold feed lines.
DO NOT use putty on deck fittings. Upper gaskets are provided.
INSTALLATION
To remove the trim from the valve body, unscrew the metal index ring and
remove the porcelain index and washer exposing the handle screw (fig.1).
Loosen and remove the handle screw and the cross handle.Then remove
the stem extension, cover, and escutcheon.
Insert the valve body through the mounting hole and screw the escutcheon
and cover down until the cover is fully seated.Then, tighten the bottom
locking-nut to secure the valve to the deck. Repeat for the other valve
assembly.
Re-attach the handle trim assemblies.
Remove the locking nut, gasket and tee assembly from the spout shank and
insert spout through the mounting hole. Please note that the diverter lift
knob must be unthreaded before removing the tee assembly. (see fig. 2).
Re-attach the locking nut and gasket to spout shank and tighten until spout is
fully secured.Then re-attach the tee assembly and diverter lift knob.
Install the flexible supply hoses between the valve bodies and the tee
assembly.
MOUNTING THE HANDSHOWER ESCUTCHEON
(see fig.3)
Remove the locking nut and gaskets from the handshower escutcheon
assembly, and insert through the mounting hole.Then, re-attach and tighten
the locking nut until fully secured.
Connect the knurled end of the hose to the bottom of the tee assembly
using the gasket supplied.
Connect the hot and cold water supplies to the side valve bodies.
After installation, unscrew and remove the aerator assembly. Carefully open
the hot and cold valves fully to flush out any debris in the supply lines. Once
the lines have been flushed, close the valves and re-install the aerator
assembly.
IMPORTANT: Check for leaks and ensure the unit is functioning properly
before closing the access panel.
If further assistance is required, please contact Product Support at:
1-800-927-2120 (8AM-7PM EST).
AMTU09

Summary of content (1 pages)