Instruction Manual

PPC-2000 User’s Guide Chapter 2: Hardware Installation
Doc.# 30002-00 Rev 2.3 Watlow Anafaze 19
Figure 2.4 PPC-2010 Jumpers
PPC-2030 Dip Switch Settings
Switch settings in the PPC-2030 determine whether encoder
inputs accept single phase or quadrature encoder signals. Each
of the four inputs is configured individually, therefore single
phase and quadrature inputs may be mixed in a module.
Wear a grounding strap and place components on static-free
grounded surfaces only. Locate switch bank 1 near the center
of the PPC-2030 module. Refer to Figure 2.5 on page 20. Set
each switch for the corresponding input to the single phase (on)
or quadrature (off) position. The switch is on when in the
direction indicated by the arrow.
ç
CAUTION!
Be sure to take antistatic precautions.
B A
B A
JU2
JU1
Battery
Notch
Flash memory
Chip (firmware)
Notch
B A
JU1
Termination
Jumper
Port 1
Not Terminated
Position