Instruction Manual

PPC-2000 User’s Guide Chapter 2: Hardware Installation
Doc.# 30002-00 Rev 2.3 Watlow Anafaze 33
Panel Mounting
NOTE!
When panel mounting terminal boards, remove the
DIN rail brackets before mounting the boards.
Figure 2.18 TB50 Panel Mounted
Stand-offs are provided for all terminal boards.
1. Remove the DIN rail mounting brackets from terminal
board.
2. Select a location with enough clearance for the board and
its SCSI cable. Refer to Figure 2.15 on page 31 for installed
clearances.
3. When a location has been determined for board, mark the
four mounting holes.
4. Drill and tap the four #6-32 mounting holes.
5. Place the terminal board so the standoffs are aligned with
the holes. insert the screws in to the standoffs and tighten
them.
Standoff