Install Instructions

IS-210-5
Series LF210-5 / 210-5
Temperature Gas Shutoff Valves
This Shutoff is an emergency device and will operate only when water temperature
approaches a maximum safe level of approximately 210°F. When it shuts off the gas to
the burner, some trouble with the operating controls is indicated. The heater installation
should be checked by a qualified service technician or licensed plumbing contractor
before being put back into service.
After operating from high temperature, the Shutoff must be manually reset (opened).
This is done by pressing on the “Reset” button, pushing it in as far as it will go (see
instructions below). Tank water temperatures must cool several degrees before valve
can be reset after operating. If, after pressing reset button, valve does not stay open
allowing gas to flow to the burner, insufficient cooling of the water is the probable
cause.
This Gas shutoff should be installed so that the temperature sensing element is located in the
water within the upper 6" of the tank.
Installation Guidelines
WARNING
!
Read this Manual BEFORE using this equipment.
Failure to read and follow all safety and use infor-
mation can result in death, serious personal injury,
property damage, or damage to the equipment.
Keep this Manual for future reference.
Local building or plumbing codes may require modifica-
tions to the information provided. You are required to
consult the local building and plumbing codes prior
to installation. If the information provided here is not
consistent with local building or plumbing codes, the
local codes should be followed. This product must be
installed by a licensed contractor in accordance with
local codes and ordinances.
WARNING
!
Need for Periodic Inspection/Maintenance: This product
must be tested periodically in compliance with local codes,
but at least once per year or more as service conditions
warrant. All products must be retested once maintenance
has been performed. Corrosive water conditions and/or
unauthorized adjustments or repair could render the product
ineffective for the service intended. Regular checking and
cleaning of the product’s internal components helps assure
maximum life and proper product function.
WARNING
!
LF210-5 M2
LFL210-5 M2
LFLL210-5 M2
LFLLL210-5 M2
WARNING
!
DO NOT INSTALL IN THE COLD WATER LINE
WARNING
!
WHEN GAS SHUTOFF OPERATES, IT SHUTS OFF GAS SUPPLY TO BOTH
MAIN BURNER AND PILOT.
Before resetting Gas Shutoff, be sure main gas valve at the heater is shut off as well as
gas to the pilot.
After resetting Gas Shutoff Valve, proceed in lighting heater as for
new installation. This valve is not adjustable. It is factory adjusted to operate before the
water temperature exceeds 210°F. Do not tamper with device in any way.

Summary of content (2 pages)